120 KVA Industrial Online UPS Case Study Tirupur
Industrial Power Backup

120 KVA 3-Phase Industrial Online UPS Deployment for Spinning Mill in Tirupur

Client: Sri Lakshmi Cotton Spinning Mills, Tirupur

The Challenge: Frequent voltage spikes and micro-power outages were causing high-speed automated yarn spinning machinery to halt, resulting in heavy thread breakage and raw material waste.

Our Solution: Engineered and commissioned a 120 KVA 3-Phase Industrial IGBT Online UPS System with galvanic isolation transformer and a 240V high-capacity tubular battery bank.

Equipment Installed120 KVA 3-Phase IGBT Industrial Online UPS + 30 Tubular Batteries
Runtime Backup30 Minutes Full Load Continuous Operation
Key OutcomeZero production downtime & 100% elimination of yarn breakage due to power dips.
50kW Commercial Rooftop Solar Case Study Coimbatore
Commercial Solar Energy

50 kW Rooftop Solar PV Installation with TNEB Net-Metering for Educational Campus

Client:Engineering College Coimbatore

The Challenge: Rising commercial electricity tariffs were straining the annual campus operating budget across computer labs, auditoriums, and administrative blocks.

Our Solution: Turnkey installation of a 50 kW On-Grid Rooftop Solar PV plant using Tier-1 Monocrystalline PERC modules and a high-efficiency 3-phase grid-tied inverter synchronized with TNEB net metering.

System Capacity50 kW Rooftop Mono PERC Grid Plant
Daily Generation200 to 220 Units Clean Solar Energy / Day
Financial ImpactReduced monthly TNEB power bills by ~82% with 3.2 years ROI.
3-Phase Servo Voltage Stabilizer Case Study Hospital Coimbatore
Healthcare Power Quality

60 KVA 3-Phase Servo Voltage Stabilizer Installation for Hospital MRI & CT Scanner

Client:Diagnostic Clinic, Saravanampatty

The Challenge: Severe utility grid line fluctuations (ranging from 160V to 290V per phase) caused diagnostic imaging equipment to trip and display calibration errors.

Our Solution: Designed and custom-manufactured a 60 KVA 3-Phase Air-Cooled Servo Voltage Stabilizer with fast-response microcontroller motor drive and digital over/under-voltage protection.

Voltage Regulation415V ± 1% Constant Output Voltage across all 3 phases
Response TimeInstantaneous correction (< 20 milliseconds)
Key OutcomeProtected ₹1.2 Cr diagnostic equipment with 100% uptime.
Solar Streetlight Installation Gated Layout Peelamedu
Residential Solar Lighting

All-in-One Solar LED Streetlight Project for 15-Acre Gated Layout in Peelamedu

Client:Owners Association, Peelamedu, Coimbatore

The Challenge: High recurring common-area grid electricity charges and cabling costs for illuminating internal layout roads and perimeter fencing.

Our Solution: Installed 45 standalone All-in-One Solar Streetlights with LiFePO4 lithium batteries, PIR motion sensors, and automatic dusk-to-dawn operation on hot-dip galvanized poles.

Units Installed45 All-in-One Solar LED Luminaires (Model 4 Series)
Energy SavedZero grid power consumption for layout outdoor lighting.
Operational LifeMaintenance-free operation with 5+ year lithium battery cycle life.

Have a Custom Power Project Requirement in Coimbatore?

Consult Our System Engineers